top of page
The existing crossing was removed entirely, and the railroad track panel was built in its place. Thermal welds were performed on the joints within the limits of the crossing. The track was raised, tamped, and dressed to the desired elevation, and new concrete panels were installed to complete the installation.

bottom of page